Web.com Headquarters

Web.com Headquarters

Project: AV Throughout Building

CCS Presentation Systems was selected by Web.com to install AV components to each floor of the corporate headquarters.

Project Components

  • Cambridge Sound
  • Crestron Control
  • QSC Conferencing
  • LG Displays
  • Arthur Holm Automated Monitors
  • Tannoy Speakers
 
 

Florida International University

Florida International University

Biscayne Campus Library’s new ASK Center

Florida International University has commenced with their ribbon cutting ceremony for the Biscayne Bay Campus’ ASK! Center at the Hubert Library on October 30, 2014. The initiative began over 1‐year ago by Dean Anne Prestamo and Associate Dean Bryan Cooper to create a student learning and support zone for writing, languages and academic technology use.

CCS Presentation Systems has contributed to the ASK! Center by installing a digital signage system at the service desk with 4‐portrait orientation displays recessed into the woodwork. Paired with the FourWinds interactive content, the service desk can update library hours, upcoming events and seminars or post emergency updates.

Additionally, CCS had helped design and implement a student interactive viewing and listening station. Powered by Crestron Electronics, the dual viewing stations allow study groups to view library video sources for review and entertainment. Each viewer also has a dedicated audio headset and amplifier for private listening and volume control. The dual touch-panels operate each station independently or can share the same video/audio source for a larger viewing group.

The project total was $35,000.00

Bank of Tennessee

Bank Of Tennessee Branch Board Room

Project Components

  • 90” Display
  • Barco Wireless Click Share
  • QSC PTZ camera for Web Conferencing
  • Shure Wireless Mics & 24×24
  • Ceiling Array
  • Crestron Control

The Ritz-Carlton

The Ritz-Carlton

CCS Installed, Programmed and integrated thirteen Crestron Control systems and panels within the Ritz’s large ballroom, allowing for optimal audio performance in any desired layout. With Crestron’s DSP Audio system , Ritz Carlton now has the flexibility to work with any event, large or small.

University of North Florida Classroom

University of North Florida Classroom

Project: 50 Classrooms & Meeting Rooms

Project Components

  • Epson Projection
  • Samsung Displays
  • AMX Enova Control
  • Tannoy Speakers
  • Middle Atlantic Lecterns

Embry Riddle University

Embry Riddle University

Project: Aeronautical Auditorium

Project Components

  • Allen & Heath QU-32 Digital Audio Console
  • Remote Digital Stage Boxes
  • JBL VRX Line Array Speakers
  • Crown DCI Audio Amp
  • BSS Soundweb Audio DSP

University of Tennessee Football Athletic Facility

University of Tennessee Football Athletic Facility

Project: Team Meeting Rooms

Project Components:

  • Epson laser projectors
  • Crestron Control
  • Da Lite Screens
  • 86” 4K Interactive Displays

PSTA Boardroom

PSTA Boardroom

Project: AV Throughout Building

CCS Presentation Systems was selected by the PSTA to install AV components to each floor of the corporate headquarters.

Project Components

  • asdfgh
  • asdrg
  • gdsfsa
 
 

Bartram Trail High School

Bertram Trail High School

Project: Football Stadium

Project Components

  • QSC Amplifiers
  • Community Processing
  • Community Speakers
  • Community Subwoofer
  • CCS Custom Audio Hardware

Orange County Public Schools

Orange County Public Schools

Orange County Public Schools

Project: High School Stadium

Project Components:

  • Outdoor Audio System Design
  • Community R Series, Full-Range Horn
    Loaded Two-Way Speakers & Subwoofer
  • Crown High Power Audio Amplifiers
  • Mackie audio mixer for user interface
  • BiAmp Nexia Audio DSP
  • Shure Wired & Wireless Microphones
  • Middle Atlantic 27ru floor standing rack
  • Williams Sound, Assisted Listening Audio System
CCS Presentation Systems installed 4 schools during the summer of 2015 that were part of OCPS digital curricullum project with equipment from Smart Technologies & Covid. CCS did installation at the following schools: South Creek Middle School, South West Middle School, Freedom High School and Oak Ridge High School. Both projects were in excess of $1,100,000.00.